What is meant by Part Submission Warrant?

What is meant by Part Submission Warrant?

A Part Submission Warrant (PSW) document or form is typically used for confirming that the supply of components into the automotive or aerospace industry meet the customer requirements and specifications.

What is a PPAP warrant?

The PPAP package is a series of documents which need a formal certification / sign-off by the supplier and approval / sign-off by the customer. The form that summarizes this package is called PSW (Part Submission Warrant).

What does PSW stand for in engineering?

The Production Submission Warrant (PSW) provides a record of the customer submission (content and declarations made) and the disposition by the customer of this, which includes any associated instructions for ongoing supply.

How do you fill a PSW PPAP?

It needs to include details such as:

  1. Part Information. Part Name.
  2. Suppliers Contact Information. Name of Supplier and/or Vendor Code.
  3. The Customers Contact Information. Customers Name and Division.
  4. Materials Reporting.
  5. Reason for Submission.
  6. Requested Submission Level.
  7. Submission Results.
  8. Declaration.

What is a PSW automotive?

PSW is an acronym for “Parts Submission Warrant”. It is used in the automotive industry when submitting a new part to a customer for approval as part of a PPAP package. PPAP stands for “Production Part Approval Process”.

What are the 5 levels of PPAP?

PPAP 5 Levels of Submission:

  • Level 1: Part Submission Warrant (PSW) only submitted to the customer.
  • Level 2: PSW with product samples and limited supporting data.
  • Level 3: PSW with product samples and complete supporting data.
  • Level 4: PSW and other requirements as defined by the customer.

Who is responsible for PPAP?

Suppliers, not customers, are responsible for PPAPs. For a supplier, this means maintaining a quality system that documents all of the requirements of a PPAP submission is a necessity.

What is full form of PSW?

The program status word (PSW) is a register that performs the function of a status register and program counter, and sometimes more. The term is also applied to a copy of the PSW in storage.

What is the full form of AIAG?

The Automotive Industry Action Group (AIAG) was established in 1982, AIAG is a not-for-profit trade association where professionals from member companies – including automakers, suppliers of all sizes, manufacturers, service providers, academia, and government – work collaboratively to streamline industry processes via …

What are the documents required for PPAP?

There are 18 documents that comprise the PPAP:

  • Design Records.
  • Engineering Change Documentations, if any.
  • Customer Engineering approval, if required.
  • Design Failure Mode and Effect Analysis (DFMEA)
  • Process Flow Diagrams.
  • Process Failure Mode and Effect Analysis (PFMEA)
  • Measurement System Analysis Studies.
  • Dimensional Results.

What is PPAP submission level?

PPAP 5 Levels of Submission: Level 1: Part Submission Warrant (PSW) only submitted to the customer. Level 2: PSW with product samples and limited supporting data. Level 3: PSW with product samples and complete supporting data. Level 4: PSW and other requirements as defined by the customer.

What are the 18 documents of PPAP?

https://www.youtube.com/watch?v=dPsJICdrCHg